EVE:Corporate Deployment: Difference between revisions
Jump to navigation
Jump to search
Stupidgenius (talk | contribs) No edit summary |
StupidGenius (talk | contribs) (removed item exchange/ship contracting) |
||
Line 14: | Line 14: | ||
Prior to a move, we will announce which stations ships and materiel will be picked up in. | Prior to a move, we will announce which stations ships and materiel will be picked up in. | ||
== Pretty much EVERYTHING Courier Contracts)== | |||
== Pretty much EVERYTHING | |||
To have your stuff moved, do the following. | To have your stuff moved, do the following. | ||
Line 39: | Line 28: | ||
# Verify it looks something like this: | # Verify it looks something like this: | ||
[[File:Eve courier contract.png]] | [[File:Eve courier contract.png]] | ||
== Ships (Item Exchange Contract)== | |||
Contact StupidGenius Charante, if you have any ship with exspensive rigs! (THIS will be expensive due to phoebe changes!) |
Revision as of 04:18, 17 March 2015
AIEU's Skylift division handles the transport logistics for all corporate deployments. When we move to a new theater of operations, member assets are moved at no cost to members.
Here's what you need to do to get your stuff moved.
General Preparation
There are two classes of assets that the corporation will move for you during a deployment.
- Ships
- Assembled and fitted ships. Since these are moved with carriers and we have many more carriers than jump freighters, it is generally more efficient for us to move assembled ships than packaged ones. This also allows you to move ships without destroying rigs.
- Material
- This includes just about everything else: packaged ships, mods, minerals, corpses, livestock, and a postcard from Poitot. This is moved by jump freighter.
Prior to a move, we will announce which stations ships and materiel will be picked up in.
Pretty much EVERYTHING Courier Contracts)
To have your stuff moved, do the following.
- Select all the items you wish to move in your hanger, right click Create Contract
- Select Contract type Courier
- Availability My Corporation
- Click Next
- Make sure all your assets you want moved are selected and verify it doesn't exceed 300,000 m3 (See bottom right corner) If you have to, make multiple courier contracts.
- Click Next
- The Expiration should be 2 weeks. The Days to Complete should be 14
- Click Next
- Verify it looks something like this:
Ships (Item Exchange Contract)
Contact StupidGenius Charante, if you have any ship with exspensive rigs! (THIS will be expensive due to phoebe changes!)